{"id":3053,"date":"2019-04-12T05:53:40","date_gmt":"2019-04-12T05:53:40","guid":{"rendered":"http:\/\/euromenaenergy.com\/?p=3053"},"modified":"2019-04-12T05:53:40","modified_gmt":"2019-04-12T05:53:40","slug":"next-generation-nuclear-25mw-smaller-safer-can-be-sited-anywhere","status":"publish","type":"post","link":"https:\/\/emimer.com\/?p=3053","title":{"rendered":"Next generation nuclear: 25MW, smaller, safer, can be sited anywhere"},"content":{"rendered":"<p><strong><em>Dan Yurman<\/em><\/strong><em>\u00a0looks at plans for\u00a0<\/em><strong><em>Small and Micro Nuclear Reactors<\/em><\/strong><em>. A\u00a0<\/em><strong><em>UK<\/em><\/strong><em>\u00a0report on Micros that generate\u00a0<\/em><strong><em>30MW<\/em><\/strong><em>\u00a0says it\u2019s an opportunity for the country to own the IP and export units that are\u00a0<\/em><strong><em>simple in design<\/em><\/strong><em>,\u00a0<\/em><strong><em>factory constructed<\/em><\/strong><em>\u00a0and capable of being\u00a0<\/em><strong><em>sited in remote locations<\/em><\/strong><em>. Given the rough ride nuclear can get, the report warns that\u00a0<\/em><strong><em>progress will depend on political, regulatory and financial support<\/em><\/strong><em>. Meanwhile, in the\u00a0<\/em><strong><em>US,<\/em><\/strong>\u00a0<strong><em>Westinghouse<\/em><\/strong><em>\u00a0will have a\u00a0<\/em><strong><em>25MWe<\/em><\/strong><em>\u00a0unit ready to test by 2022. And while the world waits for such Micros,\u00a0<\/em><strong><em>China<\/em><\/strong><em>\u00a0will begin construction at the end of this year of a\u00a0<\/em><strong><em>125MW Small Modular Reactor<\/em><\/strong><em>, expected to be\u00a0<\/em><strong><em>operational in 2025<\/em><\/strong><em>.<\/em><span id=\"more-22565\"><\/span><\/p>\n<h3><strong>Westinghouse launches new SMR effort<\/strong><\/h3>\n<p>After several earlier false starts, including a complete withdrawal in 2014 from efforts to enter the SMR market,\u00a0<strong>Westinghouse<\/strong>\u00a0<strong>buoyed with a $12.9 million grant from the<\/strong>\u00a0<strong>U.S.<\/strong><strong>Department of Energy<\/strong>, is making another go of it. The firm said\u00a0<strong>it will spend $28.9 million to demonstrate the readiness of the technology of its 25-MWe\u00a0eVinci\u00a0micro-reactor\u00a0by 2022<\/strong>.<\/p>\n<p>The government money, which is covering about half of the costs, will cover costs used toward design, analysis, licensing to manufacture, siting, and testing work.<\/p>\n<p>The monolith will serve as the second fission product barrier (the fuel pellet is the first barrier) as well as the thermal medium between the fuel channels and heat pipes. The heat pipes will extract heat from the core using a technology based on thermal conductivity and fluid phase transition.<\/p>\n<p><strong>Key technical attributes<\/strong><\/p>\n<p>On its website Westinghouse said the reactor\u2019s small size and innovative design set it apart. (Technical Profile \u2013 PDF file) Here\u2019s a short list of key technical details.<\/p>\n<ul>\n<li>Transportable as a reliable energy generator<\/li>\n<li>Fully factory built, fueled and assembled<\/li>\n<li>Output of 25 MWe electrical<\/li>\n<li>Up to 600\u00baC process heat for petro chemical and other industrial uses<\/li>\n<li>5- to 10-year life with walkaway inherent safety<\/li>\n<li>Target less than 30 days for onsite installation<\/li>\n<li>Autonomous load management capability<\/li>\n<li>Proliferation resistance through encapsulation of fuel<\/li>\n<li>Minimal moving parts<\/li>\n<\/ul>\n<div id=\"attachment_22568\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-22568\" src=\"https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5.png\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" srcset=\"https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5.png 800w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-250x88.png 250w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-768x271.png 768w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-640x226.png 640w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-80x28.png 80w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-24x8.png 24w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-36x13.png 36w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/word-image-5-48x17.png 48w\" alt=\"\" width=\"800\" height=\"282\" aria-describedby=\"caption-attachment-22568\" data-lazy-loaded=\"true\" \/><\/div>\n<div>\n<p><strong>Challenges ahead for a new design<\/strong><\/p>\n<p>Westinghouse told\u00a0Power Magazine\u00a0that it faces several key challenges. First among them is\u00a0<strong>getting enough HALEU fuel<\/strong>. The Department of Energy is supporting multiple efforts to address that issue including a contract to produce it by\u00a0<strong>Centrus Corp<\/strong>\u00a0by 2020 and deployment of a HALEU-based TRISO-X fuel fabrication pilot line at the\u00a0<strong>Oak Ridge National Laboratory<\/strong>.<\/p>\n<p>Other issues which are faced by all SMR developers include\u00a0<strong>the question of how many deals are needed to be inked in their order books to get investors to provide the funds<\/strong>for factory production facilities.<\/p>\n<p>Because the design is unique, Power Magazine noted that Westinghouse will have to go through the long and expensive safety evaluation process at the\u00a0<strong>NRC<\/strong>. The firm told Power Magazine it faces \u201cfirst of a kind\u201d challenges in licensing, instrumentation, remote reactor monitoring, and logistics.<\/p>\n<p>\u201cThese challenges require careful risk management and planning, but they are not considered showstoppers and their management is part of the Westinghouse eVinci reactor development program.\u201d<\/p>\n<h3><strong>Small modular reactors have big potential market in UK, says government-funded report<\/strong><\/h3>\n<p>(NucNet):\u00a0<strong>Micro nuclear reactors (MNRs)<\/strong>\u00a0are a feasible option for the UK and have a potential market in the hundreds by 2030, a\u00a0new government-funded report\u00a0has concluded.<\/p>\n<p>The report, produced by\u00a0<strong>Nuvia<\/strong>,\u00a0<strong>WSP<\/strong>\u00a0and\u00a0<strong>Atomic Acquisitions<\/strong>, concludes that there is great potential for development of MNRs between 2030 and 2035.<\/p>\n<p>It says MNRs,\u00a0<strong>typically under 30 MW<\/strong>, could bring significant economic benefits to the UK but must be \u201cdecisively supported\u201d because they will only proceed with clear support and facilitation of political, regulatory and financial factors.<\/p>\n<p>The study,\u00a0Market and Technical Assessment of Micro Nuclear Reactors, says;<\/p>\n<p>\u201cDue to their size and unique characteristics, there are several potential market opportunities for MNRs.<strong>\u00a0A potential global accessible market of up to 2,850 megawatts has been estimated by around 2030<\/strong>,\u201d the report says.<\/p>\n<p>\u201cA potential MNR industry could enable the UK to grow indigenous civil nuclear reactor manufacturers gaining intellectual capital at low entry cost. At present this core part of the civil nuclear supply chain is not provided in the UK.\u201d<\/p>\n<p>In its conclusions the report says key advantages of micro reactors include\u00a0<strong>simplicity of design, including safety systems<\/strong>; potential\u00a0<strong>ease of construction through factory construction<\/strong>;\u00a0<strong>lower overnight cost<\/strong>\u00a0of each unit resulting in ease of financing; and the possibility of\u00a0<strong>placing reactors in remote locations<\/strong>.<\/p>\n<h3><strong>December construction start for Chinese 125 MWe SMR<\/strong><\/h3>\n<p>(WNN) China\u2019s\u00a0<strong>Ministry of Environment<\/strong>\u00a0is proceeding to build an\u00a0<strong>ACP100 small modular reactor (SMR)<\/strong>\u00a0at Changjiang,\u00a0<strong>Hainan<\/strong>, with construction to begin by the end of this year.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-22570 size-full\" src=\"https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic.jpg\" sizes=\"auto, (max-width: 402px) 100vw, 402px\" srcset=\"https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic.jpg 402w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic-162x250.jpg 162w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic-41x63.jpg 41w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic-16x24.jpg 16w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic-23x36.jpg 23w, https:\/\/energypost.eu\/wp-content\/uploads\/2019\/04\/Micro-nuclear-Yurman-pic-31x48.jpg 31w\" alt=\"\" width=\"402\" height=\"620\" data-lazy-loaded=\"true\" \/><\/p>\n<p>According to Chinese publication Nuclear World,\u00a0<strong>construction is expected to take 65 months with the 125 MWe unit expected to start up by May 2025<\/strong>.<\/p>\n<p>According to data about the ACP100 in the\u00a0<strong>IAEA \u201c<\/strong><strong>SMR Book<\/strong><strong>,\u201d<\/strong>the ACP100 is\u00a0<strong>a multipurpose power reactor designed for electricity production, heating, steam production or seawater desalination<\/strong>\u00a0and is\u00a0<strong>suitable for remote areas that have limited energy options or industrial infrastructure<\/strong>.\u201d<\/p>\n<p>The design, which has 57 fuel assemblies and integral steam generators, (see table right) incorporates passive safety features and will be installed underground.<\/p>\n<p>A two-unit ACP100 plant will be located on the northwest side of the existing Changjiang nuclear power plant, according to the 22 March announcement. The site is already home to two operating\u00a0<strong>CNP600 PWRs<\/strong>, with\u00a0<strong>two Hualong One units also planned for construction at that site<\/strong>.<\/p>\n<p>***<\/p>\n<p><strong>Dan Yurman<\/strong>\u00a0is the author of\u00a0Neutron Bytes\u00a0and writes on nuclear matters.<\/p>\n<p>This\u00a0article\u00a0is published with permission.<\/p>\n<\/div>\n<blockquote class=\"wp-embedded-content\" data-secret=\"ZDKBkMqShB\"><p><a href=\"https:\/\/energypost.eu\/next-generation-nuclear-25mw-smaller-safer-can-be-sited-anywhere\/\">Next generation nuclear: 25MW, smaller, safer, can be sited anywhere<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;Next generation nuclear: 25MW, smaller, safer, can be sited anywhere&#8221; &#8212; Energy Post\" src=\"https:\/\/energypost.eu\/next-generation-nuclear-25mw-smaller-safer-can-be-sited-anywhere\/embed\/#?secret=ZDKBkMqShB\" data-secret=\"ZDKBkMqShB\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dan Yurman\u00a0looks at plans for\u00a0Small and Micro Nuclear Reactors. A\u00a0UK\u00a0report on Micros that generate\u00a030MW\u00a0says it\u2019s an opportunity for the country to own the IP and export units that are\u00a0simple in design,\u00a0factory constructed\u00a0and&#8230;<\/p>\n","protected":false},"author":1,"featured_media":3064,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[46,48,57,90,96,107,113,137,139,160,174,183,184,201,202,209,230,232,233,244,246,249,256,267,277,279,288],"class_list":["post-3053","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-aramco","tag-athens","tag-baroudi","tag-democracy","tag-doha","tag-embargo","tag-energy-peace","tag-gas","tag-gazprom","tag-international-maritime-disputes","tag-lebanon","tag-maritime-boundaries-east-mediterranean","tag-maritime-disputes","tag-offshore","tag-oil","tag-opec","tag-poverty-alleviation","tag-putin","tag-qatar","tag-rosneft","tag-roudi","tag-russia","tag-saudi","tag-straddling-hydrocarbons-reserves","tag-total","tag-trump","tag-usa"],"_links":{"self":[{"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/posts\/3053","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/emimer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3053"}],"version-history":[{"count":0,"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/posts\/3053\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emimer.com\/index.php?rest_route=\/wp\/v2\/media\/3064"}],"wp:attachment":[{"href":"https:\/\/emimer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/emimer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/emimer.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}